Learning History
Filter     Order     Display # 
Item Title Author Hits
Implementation of Back-Up Data Pauziah Abu Kasim & Saliwati Mohamad Ali 313
Implementation of Centralised Data for Quality Management System (QMS) At One Personal Computer Pauziah Abu Kasim & Saliwati Mohamad Ali 308
Implementation of Filing System for QA Section Pauziah Abu Kasim & Saliwati Mohamad Ali 291
Lost of Data during Reformatting of Personal Computer (PC) Pauziah Abu Kasim & Saliwati Mohamad Ali 287
Re-Briefing On the Quality Procedures Pauziah Abu Kasim & Saliwati Mohamad Ali 295
Improper Dress Code For An Official Office Function Pauziah Abu Kasim & Saliwati Mohamad Ali 274
Handing Over Process Upon Transfer of Staff Pauziah Abu Kasim & Norhidayah Mahadi 263
Filing System for Files and Data Kept In the Softcopy Format Pauziah Abu Kasim & Norhidayah Mahadi 305
Tagging Softcopy File Location on Hardcopy Documents for Effective Traceability Pauziah Abu Kasim & Norhidayah Mahadi 253
Visual and Audio Presentation during ISO 9000 Management Review Meeting (MRM) Pauziah Abu Kasim & Norhidayah Mahadi 260
Departmental K- Sharing On External Course Attended Pauziah Abu Kasim & Norhidayah Mahadi 288
Effective Departmental Team Work Location Pauziah Abu Kasim & Norhidayah Mahadi 298
First Internal Quality Audit on The Implementation of The Quality Management System per Document Pro Pauziah Abu Kasim & Saliwati Mohamad Ali 254
Omission of Handing Over Process for Hardcopy Documents Pauziah Abu Kasim & Norhidayah Mahadi 270
Omission of Contingency Plan In Preparation of Induction Pauziah Abu Kasim & Norhidayah Mahadi 256
Register of Documents Cross-Referencing Pauziah Abu Kasim & Ayunni Kunyi Mohd 234
Provision of Resources Pauziah Abu Kasim & Ayunni Kunyi Mohd 215
Payment to subcontractor Nofal Firhat Abdullah 267
Payment to suppliers for supply of materials. Nofal Firhat Abdullah 236
Recoupment for supply of materials from subcontractor Nofal Firhat Abdullah 223
Monitoring of the purchasing of construction materials. Nofal Firhat Abdullah 237
Process of amending certificate Nofal Firhat Abdullah 239
Obstruction by existing services to proposed new drain FR5 (Shah Alam) Construction Manager 239
Completed Road Experiencing Settlement Failure At Joint Between Existing and New Area FR5 (Shah Alam) Construction Manager 245
Repeated damage to the un-relocated underground cables (TNB & Telekom) underneath the pavement area FR5 (Shah Alam) Construction Manager 256
Uneven Finish Surface of Asphaltic Concrete Wearing Course (ACWC) FR5 (Shah Alam) Site Supervisor 251
Delivered piles are not according to drawings FR5 (Shah Alam) Site Supervisor 240
Bitumen content for ACWC 20 is too high FR5 (Shah Alam) QC Engineer 274
Ground Failure At Crusher Run Stockpile Area FR5 (Shah Alam) Project Manager 290
Enroachment of Newly Relocated Water Pipe Into Private Property FR5 (Shah Alam) Construction Manager 233
One leg caught in between the movement of the conveyor – bone fracture Abdullah Sani Bujang 231
Mobile crane collapses while swinging the boom to transfer loads / materials Abdullah Sani Bujang 207
Beam weighing 66 ton fell while transferring it from casting yard to bridge location Abdullah Sani Bujang 218
Unwanted small aggregates hit the supervisor while doing joint inspection with consultant Traffic & Safety Management Unit 212
Contract’s scope, details of the drawings within the in the original contract were not looked over t Juhaida Othman 202
Subcontractor do not have controlled revised drawing for construction Raizul Asri 210
Giving notice without having discussed first Norhidayah Mahadi 216
Assuming that using paver is good enough to lay wet mix macadam even though it is not equipped with Mohd Isa Amsery Tahir 235
Customer do not receive intended document that was sent to them Ahmad Nizan Mat Noor 224
Public complaints on site traffic and safety management Mohd Jamil Saad 263
Subcontractor’s slow progress Roshasmawati Abd Wahab 230
Substandard Quality of Temporary Road Diversion Farhan Nasri Abdul Rahman 220
Difficulty in tracing subcontractor’s progress claim was submitted to HQ. Fadzliah Ahmad 213
Substandard Quality of Road Curb Marzuki Haji Ibrahim 241
Pavement surface not smooth and uneven on top of bridge masjid Negeri Al-Azim Interchange, J5 Hanisman Abdul Rahman 255
Virus and Spam Attack Idzil Hafis 234
Late payment of Income Tax for C&H for the month of August 2002 Hassan Bin Mohamad 253
Interview Process in Sibu Hassan Bin Mohamad 239
Failure to process salary for Nor Azizah for the month of October 2003 Norliah Arifin 213
Sosco claim rejected by Sosco Department Wong Chew Yoon & K. Vickneswary 350
 
<< Start < Prev 1 2 Next > End >>
Results 1 - 50 of 51